Intrusion of moisture through the building envelope results in
material damage, failures, and the inability to use the building
for its intended purpose. Building envelope repair and/or
restoration are key to keeping a building functional. Hutchinson
Design Group prides itself in developing accurate and through
construction documents for the repair and/or replacement of the
following building envelope systems:
material damage, failures, and the inability to use the building
for its intended purpose. Building envelope repair and/or
restoration are key to keeping a building functional. Hutchinson
Design Group prides itself in developing accurate and through
construction documents for the repair and/or replacement of the
following building envelope systems:
- Terra cotta
- Brick masonry (solid masonry, composite construction, and cavity wall construction)
- Stone masonry
- Cast stone masonry
- Precast and cast-in-place concrete
- Cathodic protection
- Glass and metal curtain wall systems
- Wood, steel, and aluminum frame windows
- Exterior insulation and finish systems (EIFS)
- Direct-applied finish systems (DFS)
- Cement plaster and conventional stucco
- Metal composite panel systems (rain screen or barrier type)
- Residential siding (wood, fiber cement, aluminum, and vinyl)
Project Profiles:
- Evanston/Skokie School District 65 – Haven Middle School
- Evanston/Skokie School District 65 – Oakton Elementary School
- Township High School District 113 – Deerfield High School
- Township High School District 113 – Highland Park High School
- Columbus on the Park Condominiums
- Wil-Shores Condominiums